Keyword | CPC | PCC | Volume | Score | Length of keyword |
---|---|---|---|---|---|
p6 in construction scheduling | 0.04 | 0.8 | 3143 | 93 | 29 |
p6 | 2 | 0.4 | 8421 | 6 | 2 |
in | 0.23 | 0.8 | 9724 | 53 | 2 |
construction | 0.21 | 0.8 | 3531 | 25 | 12 |
scheduling | 0.5 | 0.6 | 8832 | 24 | 10 |
Keyword | CPC | PCC | Volume | Score |
---|---|---|---|---|
p6 in construction scheduling | 0.74 | 1 | 5970 | 19 |